Pakistan Science Abstracts
Article details & metrics
No Detail Found!!
A hybrid cuckoo algorithm for lot scheduling problem using extended basic period and power of two policy.
Author(s):
1. Syed Hasan Adil: Faculty of Engineering, Sciences and Technology, Iqra University, Main Campus, Karachi, Pakistan
2. Kamran Raza: Faculty of Engineering, Sciences and Technology, Iqra University, Main Campus, Karachi, Pakistan
3. Manzoor Ahmed Hashmani: Faculty of Engineering, Sciences and Technology, Iqra University, Main Campus, Karachi, Pakistan
Abstract:
This paper addresses ELSP (Economic Lot Scheduling Problem) using EBPA (Extended Basic Period Approach) model with PoT (Power of Two) policy. The objective is to solve the ELSP using HCA (Hybrid Cuckoo Search Algorithm). The proposed approach improves the solution (i.E. minimizes the total cost which is the sum of setup and inventory holding costs) obtained through GA (Genetic Algorithm).The solution obtained from HCA is compared with GA on 17 Bomberger`s problems. The comparison indicates the superiority of the proposed HCA over GA with respect to the solution quality.
Page(s): 229-238
DOI: DOI not available
Published: Journal: Mehran University Research Journal of Engineering and Technology, Volume: 35, Issue: 2, Year: 2016
Keywords:
Keywords are not available for this article.
References:
References are not available for this document.
Citations
Citations are not available for this document.
0

Citations

0

Downloads

21

Views