Pakistan Science Abstracts
Article details & metrics
No Detail Found!!
First horizontal well drilled with under balance (nitrified stable foam), downhole deployment valve & extended range EM-MWD technologies in middle east region - case study and lesson learned
Author(s):
1. Sajjad Hussain: Pakistan Petroleum. Ltd
2. Saad Saleem: Pakistan Petroleum. Ltd
3. Shahid Majeed Sabir: Weatherford Oil Tools N4 E, Limited, Pakistan
4. Muhammad Asrar: Pakistan Petroleum. Ltd
Abstract:
The name \"Sui \" has become synonymous with natural gas in Pakistan. Located at a distance of about 650 kilometers (lan) from Karachi in Balochistan Province, Sui is Pakistan Petroleum Limited. (PPL) flagship gas field. The gas field was discovered in the late 1952 and the commercial exploitation of the field began in 1955. Two major reservoirs of this field are Sui Main Limestone (SML) & Sui Upper Limestone (SUL); both have become highly depleted over the time. Conventional drilling technologies in these formations result in complete loss of drilling fluid, stuck pipe & severe formation damage. Pakistan Petroleum Limited (PPL) planned drilling Sui-93(L1) as a horizontal well in Sui Main Limestone (SML) Formation. Drilling a horizontal well with conventional drilling technology in a depleted formation having 500 psi pore pressure at a depth of -1400 m (TVD) was a real challenge. Underbalanced Drilling Technology (with DDV & ER-EM-MWD tools) was selected as an alternative drilling method. The main objectives of Under balance Drilling Operation were to drill to target depth while eliminating fluid losses with associated problems and improve drilling performance. A multidisciplinary team of Drilling Operations experts planned and executed this challenging project. Considering the reservoir pressure of formation, stable foam was selected as drilling fluid fir UBD operations. Extended Range Electromagnetic MWD tool was used for directional control along with APWD (Annular Pressure while drilling) sensor for real time Bottom Hole Pressure monitoring. Open hole section (-600 meter) was drilled successfully in Sui Main Limestone (SML) Formation.Integrated efforts of Pakistan Petroleum Limited (PPL) and associated service companies of various disciplines during planning and operation phases of the well led to this successful project. This paper highlights key factors in the underbalanced drilling design phase, operational challenges faced during execution and results of the first well -ed in Middle. East region using above mentioned is aced group of technologies. These applications have opened new ventures and opportunities .for depleted field developments in the region and particularly in Sui field of Pakistan.
Page(s): 311-321
DOI: DOI not available
Published: Journal: Proceedings SPE-PAPG Annual Technical Conference, Volume: 0, Issue: 0, Year: 2011
Keywords:
Keywords are not available for this article.
References:
References are not available for this document.
Citations
Citations are not available for this document.
0

Citations

0

Downloads

31

Views