Abstract:
The methods adopted by the author to stabilize Bomlanwala Ravi Bedian Link canals to run its authorized supply of about 5000 cusecs is described. (From Engng News, 1965, 10(1): 20).
Page(s):
DOI:
DOI not available
Published:
Journal: Proceeding of West Pakistan Engineeringg Congress, Volume: 48, Issue: , Year: 1965