The design of water resources project with inadequate data, Rawal Dam: A critical study of run-off and maximum flood discharge.
Author(s):
1. M. Faqir Chaudhry:
Abstract:
From the analysis made, it is clear that an over estimation of maximum flood has been done. Rather 100% increase on the ever recorded Max. Flood discharge has been taken into account while designing the capacity of spillway and flood absorption capacity. Such 100% increase means more than 100% in the cost of construction and maintenance.
Page(s): 48-54
DOI: DOI not available
Published: Journal: Pakistan Engineer, Volume: 10, Issue: 3--6, Year: 1974