Article Detail — Pakistan Science Abstracts

Choose Theme

Theme 1 — Green & Gold

No Detail Found!
Work index and grinding energy assessment of Dilband Iron Ore, Pakistan
Author(s)
Muhammad Ishaque Abro Department of Metallurgy & Materials Engineering, Mehran University of Engineering and Technology, Jamshoro, Pakistan
Abdul Ghani Pathan Department of Mining Engineering, Mehran University of Engineering and Technology, Jamshoro, Pakistan
Abdul Hakeem Mallah Department of Metallurgy & Materials Engineering, Mehran University of Engineering and Technology, Jamshoro, Pakistan
Abstract
Importance of comminution in mineral processing sector is highly acknowledged from energy perspective. In present study an attempt was made to understand the comminuting behavior of Dilband iron ore and to compute the grinding energy requirement for production of ultrafine particles up to mesh of liberation. In this regard standard grindability tests developed by the Chair of Mineral Processing Leoben Austria was used for calculating work index of Dilband iron ore. The grinding tests were conducted in rod and ball mills. The work index value of two feed size fractions with 80% passing at 3800µm and 5200µm was noted to be 11.85 kwh/t and 9.3 kwh/ton respectively. Ball mill grinding test indicates that dry grinding in open circuit is not efficient and consumes more energy of 88.48kwh/t of ore for grinding 1000/40µm to 80% <40µm size.  
Publication Details
Page(s) 29-34
DOI DOI not available
Published Journal: Mehran University Research Journal of Engineering and Technology, Volume: 30, Issue: 1, Year: 2011
Keywords
Keywords are not available for this article.
References
References are not available for this document.
Citations
Citations are not available for this document.
0

Citations

0

Downloads

74

Views

Copyright ©  PASTIC National Center, Islamabad www.pastic.gov.pk